New Quito International Airport

Location

Quito, Ecuador

Duration

2010 - 2013

Customer

AECON

Service

Chief Technology Officer
Design
Construction
Integration
Quality Assurance

New Quito International Airport

Location

Quito, Ecuador

Duration

2010 - 2013

Customer

AECON

Service

Chief Technology Officer
Design
Construction
Integration
Quality Assurance

Key features about the project:
  • Area of development: 1,500 acres
  • The air traffic control tower is 41m tall, with the building occupying a site of 901m²
  • The cargo and support area have 10,000m² of storage space and 2,200m² for offices, refrigerated storage and access (bonded) areas, as well as a 5,000m² hangar for maintenance activity
  • Location – 18km away from the center of Quito.7,500 m. above sea level
  • Runway: 4.5 km
  • Passengers: over 5 million in 2018
  • Operating: February 2013
Groisman Engineering served in various positions:
  • CTO of the project, Focus of knowledge and professional guide for planning, schedule and risk management implementation and support of international BOT projects
  • Specification, design, construction, integration, acceptance testing and quality assurance and operational command and control systems for this major BOT project. Main fields – electrical systems, low voltage and control structures, command and control systems, communications, information systems, control rooms and central control, security and observation systems, data communications, radar and guidance systems, Meteorology, fiber optic infrastructure, operation and maintenance. Ongoing contacts with FAA and FAA airspace

The New International Airport in Quito, Ecuador